Case Studies

Hubert has conducted out many projects over the years. You will find our projects in new construction (EPC) projects as well as renovation and optimization of existing factories.

Below are some examples that will be gradually supplemented. Are you looking for a project example (similar to your situation) and you cannot find what you are looking for then contact us. We may then be able to compile a compilation of a similar project that we have already carried out for you.

20160421 171531

Anglian Water / Elsham Water Treatment Centre

Potable Water Production Plant

United Kingdom

Project introduction

For the Elsham water treatment plant owned by Anglian Water, Hubert was awarded the contract for delivery and installation of 3 micro strainers. The facility in Elsham processes 75 million litres (16.5 million gallons) of water every day. The plant supplies much of the drinking water for Northern Lincolnshire. Anglian Water had a lot of problems with zebra mussels that clog the water inlet pipe from the river Ancholme. The zebra mussel, Dreissena Polymorpha, is a specied of small freshwater Shellfish.

Hubert Case Study Jgc Gulf Bapco 2 E1597737852898

BAPCO / JGC Gulf International

HLPH Facility – Refinery / Seawater intake filtration system

Bahrain

Project introduction

Hubert was awarded the contract from JGC Gulf International Co. Ltd. for the Bahrain Petroleum Company (BAPCO) to improve the seawater filtration system at their HLPH facility. The Sea Water Intake Filtration system had to be delivered including all complementary equipment, items and services to meet the design and environmental conditions. Hubert was responsible for ensuring that the specification was met for all deliveries and services in subcontracting.

Hubert Case Strudy Wetterskip Fryslan

Wetterskip Fryslan

Wastewater Treatment Plant (WWTP)

Netherlands

Project introduction

For the Birdaard waste water treatment plant owned by Wetterskip Fryslân – the regional water board – Hubert was awarded the contract for delivery and installation of a new clarifier. This waste water treatment plant, located in the north of the Netherlands, is already operating with the aid of Hubert thickeners, aerators and clarifiers.

Hubert Case Study Edf Reel Flamanville E1597749532252

EDF / REEL International

Flammanville Nuclear Power Plant 1 & 2

France

Project introduction

Hubert was awarded the contract for EDF’s nuclear power plant Flamanville 1 & 2 in France for replacement of screening drums via the collaboration with partner Reel International, known from their extensive experience in nuclear projects. Screening drums are part of the seawater intake filtration system. Hubert was responsible for ensuring that the specification was met for all deliveries in subcontracting. This project is a technical outstanding performance and consolidates and strengthens Hubert’s position in this market segment.

Hubert Case Study Yanbu Ii 5

SWCC / Marafiq / Saudi Archirodon

Yanbu II Power and Desalination Plant

Saudi Arabia

Project introduction

Hubert was awarded the contract for delivery of the marine package or seawater intake filtration system. Hubert was responsible for ensuring that the specification was met for all deliveries in subcontracting.

Img 20160219 Wa0001 1 E1602503179325

Hadjret En Nouss

Combined Cycle Power Plant

Algeria

Project introduction

Hubert was awarded the contract in collaboration with Taprogge Germany to supply the seawater screening system for the SKH Powerplant in Algeria. 

Hubert Case Study Kurskaya Power Plant 5 E1597755492687

ASE / Rosatom State Corp. Engineering Division

Kurskaya Nuclear Power plant II

Russian Federation

Project introduction

Hubert was awarded the contract by ASE (Rosatom State Corporation Engineering Division) to supply water-treatment units for the GA make-up water installation at the Kurskaya Nuclear Power Plant.

Shell Pernis Reference 2013 Overhaul Drumscreen 1

Shell Netherlands Refinery BV / Jacobs

Pernis Refinery

Netherlands

Project introduction

Hubert took care or the overhaul a water intake screen for Pernis refinery, the largest refining site in Europe and one of the largest worldwide. It was a complex project from the removal of the complete screen, renovation under controlled conditions, to reassembly on site.

Customer Stories

Project: Replacement of gutter and clearing bridge settling tank at WWTP Birdaard

The elaboration of the drawings with accompanying calculations in the preparation phase were well worked out. The construction of the new gutter and bridge was installed satisfactorily by employees and especially the foreman. The project was completed on time, both financially and in the delivery of product certificates and revision. A great project and end result was achieved through synergy between client and contractor.

Wetterskip Fryslan, Netherlands, mr. R.T. van der Zee, Design coordinator – Director