About Hubert
A new step
a new name… Noardling
From November 2023 Hubert Stavoren BV, Landustrie and DeSah BV will continue together from Sneek at Landustrie’s facility in Sneek, located at Pieter Zeemanstraat 6.
And, starting in 2025, the new name will be Noardling. This new name fits well with who we are and where we come from. The name Noardling shows that we are moving forward, but never forgetting our foundation. This is what makes us strong and ready for the future.
Hubert products
With our Hubert range of products, we focus on the market of water intake screens, suitable for water intake and filtration.
- Cooling water and process water for industrial applications.
- Drinking water or potable water, safe for ingestion.
Our equipment stands for high-spec steel assemblies, specialising in complex (welded) steel parts.
Hubert’s History
Founded in 1880
Hubert, also called Hubert Stavoren BV, founded in 1880, has almost 150 years experience in design and engineering, manufacturing, installation and service of equipment for water purification and water intake. Over the years we gained an extensive number of satisfied customers and project references all over the world. Our equipment is a crucial part of major production facilities in many industries and usually continuous in operation. Our machinery has to operate efficiently and reliably in extreme enviroments and (weather) conditions.
Quality Assurance
ISO certified for more than 25 years!
- Quality Management ISO 9001:2015
- Factory Production Control as per DIN EN 1090-2 (EXC2)*
- Safety Management VCA** SCC-SHE
- ISO 3834 part 2 Certificate – EWF Welding Quality Man. Scheme (DOC. EWF 636 – Part 1)
- ISO 3834 part 2 Certificate – IIW Manufacturer Cert. Scheme
- Achilles Joint Qualification System – Oil Industry
*DIN EN 1090-2 (EXC2): Execution class 2 comprises all supporting structures made of steel up to strength class S700 and structural components made of aluminium alloys).
Customer Stories
Project: Replacement of gutter and clearing bridge settling tank at WWTP Birdaard
The elaboration of the drawings with accompanying calculations in the preparation phase were well worked out. The construction of the new gutter and bridge was installed satisfactorily by employees and especially the foreman. The project was completed on time, both financially and in the delivery of product certificates and revision. A great project and end result was achieved through synergy between client and contractor.
Wetterskip Fryslan, Netherlands, mr. R.T. van der Zee, Design coordinator – Director