
Seawater cleaning at Algerian power plant
For the Shariket Kahraba Hadjret En Nouss (SKH) Combined Cycle Power Plant in Algeria, Hubert, in collaboration with Taprogge GmbH, supplied a robust and fully automatic system for filtration/cleaning of incoming seawater. This installation ensures reliable protection of the cooling water systems, essential for the continuity of the power plant.
Reliable solution for water intake system
Location:
Algeria
Client:
SKH power station
Market:
Water intake systems
Year of completion:
2015
What we delivered
For this project, Hubert supplied a complete, fully automatic cleaning system. The installation consists of six cable-operated Damran-type grate cleaners, specifically designed to efficiently remove coarse debris from seawater. In addition, an integrated dirt removal system was realised, including a conveyor belt, a monorail and a gripper, which is used to dispose of the collected material. The controls are tailored to the automatic operation of both cleaning and dirt removal. The plant was completed in 2015 and has since been operational at the power plant on the Algerian coast.
Why this solution?
- Fully automatic operation
- Robust and reliable design
- Low-maintenance
- Durable materials
- Suitable for industrial application
Technical details
Type
Damran cleaner
Implementation
cable retrieved
Material
coated and stainless steel
“A solution that works. Day in, day out. Without fuss and with maximum operational reliability.”
Also need a smart solution?
Do you have a property in the countryside or a location without a sewer connection? Noardling is happy to help you with a suitable and sustainable wastewater solution. Contact us for personal advice or a no-obligation quotation.