Hubert Case Study Hadjret And Nouss2

Seawater cleaning at Algerian power plant

For the Shariket Kahraba Hadjret En Nouss (SKH) Combined Cycle Power Plant in Algeria, Hubert, in collaboration with Taprogge GmbH, supplied a robust and fully automatic system for filtration/cleaning of incoming seawater. This installation ensures reliable protection of the cooling water systems, essential for the continuity of the power plant.

Client

Location:
Algeria

Client

Client:
SKH power station

Market

Market:
Water intake systems

Year of completion

Year of completion:
2015

What we delivered

For this project, Hubert supplied a complete, fully automatic cleaning system. The installation consists of six cable-operated Damran-type grate cleaners, specifically designed to efficiently remove coarse debris from seawater. In addition, an integrated dirt removal system was realised, including a conveyor belt, a monorail and a gripper, which is used to dispose of the collected material. The controls are tailored to the automatic operation of both cleaning and dirt removal. The plant was completed in 2015 and has since been operational at the power plant on the Algerian coast.

Why this solution?

See how this installation suits you

Technical details

Type
Damran cleaner

Implementation
cable retrieved

Material
coated and stainless steel

“A solution that works. Day in, day out. Without fuss and with maximum operational reliability.”

Harm Hofman Sales Manager Water Screening
20160221 103936

Project in pictures

From placement to final result - a compact project with great impact.

Also need a smart solution?

Schedule a consultation
Group Photo Edited For Website (1)