1. Home
  2. Hubert Case Studies
  3. Case Studies Hadjret en Nous

Case Study

Shariket Kahraba Hadjret En Nouss (SKH)

Combined Cycle Power Plant

Algeria

Project introduction

Hubert was awarded the contract in collaboration with Taprogge Germany to supply the seawater screening system for the SKH Powerplant in Algeria. 

Hubert Coarse screen - Damran
Hubert Case Study Hadjret en Nouss
Hubert Case Study Hadjret en Nouss
Hubert Case Study Hadjret en Nouss
Hubert Case Study Hadjret en Nouss

Hubert Supply

Our scope included engineering, manufacturing, electric control of (6) cable operated barscreens (Hubert damran) complete with debris removal system. The debris removal system is a combination of a conveyor belt, a monorail and trash rake system.

The conveyor transported the collected debris from the Damrans to a concrete trough. Using a trash rail gripper, the waste was transported to a container. The fully automatic system cleans the bar screens and removes the debris when necessary.

Key Figures

  • Location: Algeria
  • Hubert products: cable operated bar screens (damran), conveyor system, monorail and trash rake gripper
  • Materials: coated carbon steel and stainless steel 316L
  • Year: 2015

Hubert: in-house design, engineering and manufacturing!

Interested in working with us?

Our Clients

  • Hubert Clients & References