Case Study

ASE / Rosatom State Corp. Engineering Division

Kurskaya Nuclear Power plant II

Russian Federation

Project introduction

Hubert was awarded the contract by ASE (Rosatom State Corporation Engineering Division) to supply water-treatment units for the GA make-up water installation at the Kurskaya Nuclear Power Plant.

Hubert case study Kurskaya power plant
Hubert case study Kurskaya power plant
Hubert case study Kurskaya power plant

Hubert Supply

Hubert’s supplied Hubert travelling band screens accommodated with a fish return system. The band screens are based on a skid design and are delivered as a package for immediate installation and operation on-site. All rotating parts are fabricated in 316L stainless steel.

The complete band screen housing is produced from carbon steel provided with a high-quality, multilayer epoxy coating for protection against local environmental conditions. The design flow capacity for each band screen is 9,000m3 per hour. The square mesh opening in the screen panels is 2 x 2 mm.

Key Figures

  • Location: Russian Federation
  • Hubert products: traveling band screen
  • Materials: stainless steel 316L
  • Year: 2019

Hubert: in-house design, engineering and manufacturing!